Complete Administrator Manual

Updated: Feb 4
Target Audience: System Administrators and Department Supervisors
Core Purpose: To synchronize production demands with workforce availability through a centralized digital agenda.
1. Roles: Defining Access
Purpose: Ensure users have the correct level of access to the system.
Key Functions: Define permissions for the Admin Application vs. the Employee Application.
Procedure: To create a new role, click Add, name the role (e.g., "Shift Lead"), and select which menu items they are authorized to edit.
Pro-Tip: Use specific roles for supervisors to limit their access to only their specific departments.
To see more details visit Roles & Permissions
2. Catalogs: The Building Blocks
Purpose: The centralized library for organizational data.
Key Components:
Users & Departments: The people and their organizational groups.
Skills: Applied to users to verify competency.
Jobs vs. Positions: A Job is a category (e.g., Operator); a Position is a Job at a specific Place (e.g., Operator - Line 1).
SKUs: The staffing "recipe" for a specific product run.
To see more details visit Catalogs
3. Schedule Catalogs: The Blueprint
Purpose: To build the timing rules for the facility.
Base Models: The day-on/day-off pattern (e.g., 5-on, 2-off).
Shifts: Specific start times and durations (e.g., 06:45 start, 8.5-hour duration).
Patterns: Combines a Model and a Shift to establish a payroll-ready rotation.
To see more details visit Schedule Catalogs
4. Schedules: Staffing the Patterns
Purpose: Assigning specific people to the Blueprints created in the Schedule Catalog.
Procedure: Navigate to a specific Schedule, open the Workforce list, and drag and drop an employee into the rotation.
Impact: Once saved, this employee is automatically scheduled for that rotation until a manual change is made.
To see more details visit Schedules
5. Workload: Planning Production
Purpose: Translating production goals into labor requirements.
Methods:
Manual: Enter specific SKU, Place, and Time.
Templates: Load pre-saved standard runs.
CSV Upload: Import exports directly from your ERP system.
Key Action: Always hit "Run Engine" to push the workload into the Action Center.
To see more details visit Workload
6. Gantt: The Visual Timeline
Purpose: High-level visualization of the facility.
Projection Schedule: Focuses on People (Blue = Regular, Green = OT, Red = Time Off).
Production Schedule: Focuses on Work (shows which SKUs are running in which areas).
Tools: Use the Calendar Picker and Zoom Toggle to change your perspective from daily to monthly.
To see more details visit Gantt Views
7. Action Center: The Live Operations Hub
Purpose: The daily "Command Center" for gap management.
Gap Management: "Red Holes" indicate unstaffed positions.
Manual Fill: Click a Red Hole and select a skilled employee to create Green (Assigned OT).
Marketplace: Click a Red Hole and select "Create Overtime Opportunity" to create Yellow (Voluntary OT).
Time-Off: Approve sick/vacation requests here; the system automatically creates a Red Hole for the vacancy.
To see more details visit Action Center
8. Feedback: Continuous Improvement
Purpose: Direct communication with the software developers.
How to use: Click the Feedback button at the bottom left.
Details: Provide clear descriptions of bugs or "Feature Requests" to help the product evolve to meet your facility’s needs.
To see more details visit Give Feedback


